top of page
SUNY Plattsburgh

Angle Lane Water Tank Rehabilitation

Town of Halfmoon, New York

This project involved complete rehabilitation of a 400,000-gallon water tank located in the Town of Halfmoon.

MJ designed the complete removal and replacement of the interior paint coating of the steel hydropillar-style tank. The design included localized spot repairs of both the interior and exterior tank walls, and exterior tank wall sealant.

MJ’s design called for the installation of an active mixing system to reduce damage from ice formation and provide additional aeration within the stored water. The cathodic protection was replaced prior to returning the tank to service.

SOCIAL

PHONE

EMAIL

HEADQUARTERS

  • Instagram
  • LinkedIn
  • Facebook
  • Youtube

518.371.0799

21 Corporate Drive, Clifton Park, NY 12065

MJ Engineering, Architecture, Landscape Architecture, and Land Surveying, P.C.

bottom of page